|
Project:
|
Bira Ferry Terminal
|
|
Description:
|
Breakwater for ferry terminal.
|
|
Location:
|
Bira, South Sulawesi, Indonesia
|
|
Structure Type:
|
Breakwater
|
|
|
Owner:
|
Department of Transportation
|
|
Engineer:
|
LAPI-ITB
|
|
Contractor:
|
Wijaya Karya (WIKI)
|
|
Project Date:
|
2003
|
|
|
Design Conditions:
|
wave height = 3.5 m
wave period = 8.0 s
structure slope = 1.5H:1V
design water depth = 4.0 m
|
|
|
Armour Layer:
|
One layer regularly placed AJs.
C = 2.5 m
W =
|
|
|
Underlayer:
| |