|
Project:
|
Bonner Bridge
|
|
Description:
|
Pier scour protection for Bonner bridge.
|
|
Location:
|
Nags Head, North Carlonia, USA
|
|
Structure Type:
|
Scour protection
|
|
|
Owner:
|
North Carolina Department of Transportation
|
|
Engineer:
| |
|
Contractor:
| |
|
Project Date:
|
5/2005
|
|
|
Design Conditions:
|
wave height =
wave period =
water depth =
current speed =
|
|
|
Armour Layer:
|
Single layer of bundled AJs
C = 1.2 m, C = 1.8m
W =
|
|
|
Underlayer:
| |